- introduction to TwinCAT eXtended Automation Technology (XAT)
- eXtended Automation Engineering environment (XAE), Microsoft Visual Studio® integration
- Communication with Hardware
- IEC 6 1131-3 programming
- Input /Output Variable Declarations and Standard Data Types used
- Linking of Software Variables with Hardware Inputs and Outputs
- Use of standard Function Blocks and Functions from standard Library.
- Creating User Defined Function Block and Function and Libraries.
- Automatic PLC start, Data Remanence and Source code Download.
- ADS Connectivity
Requirements
- Experience of PLC Programming and Good Knowledge of Windows O.S.
Recommended for
- OEM
- SI
- End Users
- Ordering information
- TwinCAT 3 Training: PLC Programming
- Ordering number
- BAIN TR3020
- Category
- Basics
- Training duration
- 3 days