The focus of this training is on operation and diagnostic functions of the TwinCAT system and to a lesser extent PLC programming. The NC part provides information about axis positioning with TwinCAT NC PTP and an introduction to Measurement project facilities will be covered for diagnostic purposes.
Contents
- Beckhoff Product range introduction with technical detailing
- PC based control technology and Real-Time extension.
- TwinCAT handling, commissioning, IEC 61131-3 programming
- Electrical connections and installation guidelines
- Backup management and diagnostic facilities for controllers.
- EtherCAT diagnostics
- TwinCAT NC PTP: basics of axis commissioning and error identification
- TwinCAT Measurement Project for diagnostics
Pre-requisites
- Sound knowledge on handling PLC systems, Windows functionalities and Electrical Basics.
For Whom
- Customers using TwinCAT3 with Beckhoff PC based control systems
- Ordering information
- TwinCAT 3 Training: Commissioning, Maintenance and Service
- Ordering number
- BAIN TR3010
- Category
- Basics
- Training duration
- 3 days