The focus of this training is on IEC 61131-3 programming and the communication options under TwinCAT. The training is both aimed at advanced PLC programmers who are switching to the TwinCAT system and beginners with basic programming skills.
In the second part of the course (day 4 and 5), you will learn basics of the BACnet communication protocol as well as the programming and commissioning of BACnet applications with Building Automation Software (TS8040).
Contents
- TwinCAT PLC: TwinCAT handling, IEC 61131-3 programming
- TwinCAT ADS: communication interface, high-level language communication
- introduction to the communication between TwinCAT control systems
- BACnet basics and possible implementation scenarios
- BACnet basics in context with the TwinCAT System Manager and TwinCAT PLC Control
- getting to know the TcBA TwinCAT Library
Requirements
- assured handling of Windows operating systems
- experience in PLC programming
- knowledge of PLC programming with high-level languages, such as e.g. variable declaration, variable classes and structures
- basic knowledge of BACnet
- Ordering information
- TwinCAT 3 Training: Building automation programming with BACnet and TwinCAT HMI
- Ordering number
- TR5050
- Category
- Building Automation
- Training duration
- 5 days