Contents
- Introduction to TwinCAT 3 eXtended Automation Technology
- TwinCAT XA Engineering, Integration in Microsoft Visual Studio®, TwinCAT XA Runtime (XAR)
- Creating the I/O configuration, link between PLC program and hardware
- Introduction to IEC-61131-3 programming
- IEC-61131-3 program organization units (POU)
- Basics of ADS communication
- ADS: communication interface, high-level language connection, examples in C #
Requirements
- Safe handling of Windows operating systems
- Visual Studio® 2017 version is installed on the computer
- The participant's computer is prepared with the current TwinCAT 3 XAE Shell.
- Knowledge of PLC programming and / or high-level language
- No prior knowledge of TwinCAT 2 or IEC 61131-3 is necessary.
- Ordering information
- Online | TwinCAT 3 Training: PLC basics, ADS
- Ordering number
- TR3030-0010
- Category
- Basics
- Training duration
- 2 ½ days (5 x 0.5 days)